Skip to main content

Semi-Annual Groundwater Production Statements & Method Worksheets

Statements and Worksheets are both required for filings to be considered complete.

Steps to Completing Groundwater Forms

 

Instructions Pamphlet - Page 1 (6-2010) --  Water Use FactorsInstructions Pamphlet - Page 2 (6-2010) -- Water measurements, Worksheet options

 

PRODUCTION STATEMENT - CURRENT REPORTING PERIOD

Groundwater Production Statement for January 1 - June 30, 2022

DUE July 30, 2022

Semi-annual Groundwater Production Statement, All Zones, Jan-June 2022 

 

 METHOD WORKSHEETS

The most commonly used Method Worksheets are Method A (meter readings) and Method C (estimation by type of use). 

 

Method A Worksheet  (meter readings)Method B-1 Worksheet  (power)Method B-2 Worksheet  (elapsed time)Method C Worksheet (estimation by type of use)

 

 

 

PRODUCTION STATEMENT - PREVIOUS REPORTING PERIODS

Contact the District office to receive Groundwater Production Statement for previous reporting periods.

Join our mailing list