Skip to main content

Semi-Annual Groundwater Production Statements & Method Worksheets

Statements and Worksheets are both required for filings to be considered complete.

Steps to Completing Groundwater Forms

 

Instructions Pamphlet - Page 1 (6-2010) --  Water Use FactorsInstructions Pamphlet - Page 2 (6-2010) -- Water measurements, Worksheet options

 

PRODUCTION STATEMENT - CURRENT REPORTING PERIOD

DUE January 31, 2024

Groundwater Production Statement for July 1 - December 31, 2023

Please complete the Production Statement for your specific property location zone.   Groundwater Production Charges, per Acre-Foot, VARY BASED ON ZONE.

ZONE A : Semi-Annual Groundwater Production Statement - July - December 2023ZONES B & B1: Semi-Annual Groundwater Production Statement - July - December 2023ZONES C, D, E, & F: Semi-Annual Groundwater Production Statement - July - December 2023

 

 METHOD WORKSHEETS

The most commonly used Method Worksheets are Method A (meter readings) and Method C (estimation by type of use). 

ALL zones use the same Method Worksheets.

Method A Worksheet  (meter readings)Method B-1 Worksheet  (power)Method B-2 Worksheet  (elapsed time)Method C Worksheet (estimation by type of use)

 

 

 

PRODUCTION STATEMENT - PREVIOUS REPORTING PERIODS

Contact the District office to receive Groundwater Production Statement for previous reporting periods.

Join our mailing list